后勤执行练习 (Unit 11 Practice)
后勤执行 Practice (10 questions)
#practice #logistics-execution
Related Concepts
📌核心模式(点击查看)
| Keyword | Answer |
|---|---|
| LE 3 components | WM (from MM), Shipping (from SD), Transportation (from SD) |
| Warehouse # assignment | Plant + Storage Location |
| Interim storage prefix | 9 (e.g., 902 GR, 916 shipping) |
| GR process form | IM-posting-driven |
| GI process form | Delivery-driven |
| TO = | Handling instruction for physical movement |
| Picking status A → C | Not picked → Fully picked |
Question 1 - LE Components [recall]
Name the three components of Logistics Execution and state which SAP modules they were originally part of.
📌查看答案
- Warehouse Management – originally from MM (Materials Management)
- Shipping – originally from SD (Sales and Distribution)
- Transportation – originally from SD (Sales and Distribution)
LE bundled these existing functions together and developed them further.
Question 2 - Organizational Unit Assignments [recall]
Match each LE organizational unit to its assignment: warehouse number, shipping point, transportation planning point.
📌查看答案
| Organizational Unit | Assigned to |
|---|---|
| Warehouse Number | Plant + Storage Location (1:N) |
| Shipping Point | Plants (N:N possible) |
| Transportation Planning Point | Company Code (1:1) |
Key rule: A plant-SLoc combination can only be assigned to one warehouse number.
Question 3 - Interim Storage Areas [recall]
What is special about interim storage areas in the warehouse number substructure? Name two examples and their storage type keys.
📌查看答案
- 902: Goods receiving zone (for external receipts)
- 916: Shipping zone (for outbound deliveries)
Stock in these areas is represented as quants.
Question 4 - Two Process Forms [application]
A colleague asks: “For a goods receipt from a vendor, should we create the delivery first or post the IM goods receipt first?” What is the correct answer?
📌查看答案
The delivery-driven form applies to outbound processes (sales orders) where the outbound delivery is created first.
Question 5 - GR Process: Transfer Requirement [recall]
What conditions must be met for the system to automatically generate a transfer requirement during a goods receipt?
📌查看答案
- A WM tab page appears at item level in MIGO
- When GR is posted to that SLoc, the system generates a transfer requirement (in addition to material and accounting documents)
- The incoming quantity is booked into interim storage area 902 as a quant
Question 6 - Transfer Order and Stock Status [application]
During a GR putaway process, the transfer order has been created but not yet confirmed. Can the warehouse manager access this stock for another order?
📌查看答案
- Stock to be removed from the goods receiving area (902)
- Stock to be placed (putaway) at the destination storage type
The stock is not accessible until the TO is confirmed.
Question 7 - Outbound Delivery Creation [recall]
When creating an outbound delivery (VL01N) with reference to a sales order, what information does the system determine for each delivery item?
📌查看答案
- Picking storage location for each item
- Whether that SLoc is assigned to a warehouse number (if yes, displayed in delivery)
- Overall picking status (e.g., A = not yet picked)
- Stock removal status (whether TO is required)
- Shipping dates from the order (GI date, loading date, material availability date)
Question 8 - Picking Status Flow [application]
An outbound delivery shows picking status “A”. After what actions does it change to “C”?
📌查看答案
- Create transfer order (LT03) with reference to the outbound delivery for stock removal
- Confirm the transfer order (via VL06O → Confirm Picking, or LT12)
After confirmation, both statuses show C:
- Picking status: C = Fully picked
- WM transfer order status: C = Confirmed
Only then can you post GI (VL02N).
Question 9 - Post GI Prerequisites [application]
A user tries to post goods issue for an outbound delivery but the system does not allow it. What should they check?
📌查看答案
- Both statuses must be C (Fully picked AND WM TO confirmed)
- The transfer order must have been confirmed before GI posting
- If status is still A, the TO has not been created or confirmed yet
The system validates that picking is complete before allowing the IM goods issue posting.
Question 10 - GR vs GI Process Comparison [recall]
Compare the GR and GI processes with LE: which form are they, what is the interim storage area, and when does the IM posting occur?
📌查看答案
| Aspect | GR with LE | GI with LE |
|---|---|---|
| Process form | IM-posting-driven | Delivery-driven |
| IM posting timing | First (at beginning) | Last (after picking) |
| Interim storage | 902 (GR zone) | 916 (shipping zone) |
| First LE document | Transfer Requirement (auto) | Outbound Delivery (manual) |
| TO purpose | Putaway (into warehouse) | Picking (out of warehouse) |
| Stock destination | Rack storage (final bin) | Shipping zone → customer |
📌模式总结(点击查看)
| Keyword | Answer |
|---|---|
| LE source modules | WM from MM, Shipping + Transportation from SD |
| Warehouse # ↔ assignment | 1 warehouse # : N plant-SLoc combos |
| Storage section minimum | At least 1 per storage type (mandatory) |
| Picking area | Optional (unlike storage section) |
| Interim storage keys | Start with 9 |
| GR zone type | 902 |
| Shipping zone type | 916 |
| GR process | IM posting → TR → TO → Confirm |
| GI process | Sales order → Delivery → TO → Confirm → GI |
| TO = physical movement doc | Handling instruction for storeperson |
| Picking status A | Not yet picked |
| Picking status C | Fully picked |
| Stock during putaway (TO not confirmed) | In transit, not accessible |
| VL06O | Outbound delivery monitor |
| Post GI T-code | VL02N |